Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4160172 |
|---|---|
| Organisation Name | Indo Tibetan Border Police |
| Tender Brief | Corrigendum : Construction Of Boundary Wall Powder Coated Weld Mesh Panel Guard Room And 2 Nos Steel Gate With Boom Barrier At 1 Bn Itbp Joshimath Ukd |
| Last Date For Submission | 30th May, 2026 |
| Opening Date | 01 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 1917524.00 |
| Estimated Cost | 95876155.00 |
| City | Joshimath |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 76.8 | cum |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 1847.02 | cum |
| 3 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Hard rock (blasting prohibited) | 736.89 | cum |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 511.35 | cum |
| 5 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 6145.2 | sqm |
3 Days Left