Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4870077 |
|---|---|
| Organisation Name | Kerala State Electricity Board |
| Tender Brief | Corrigendum : Providing Supply To The Proposed 110kv Substation Carborundum By Constructing New Dc Line From 110kv Klep Feeder Liloing Between Loc 27 And 28 Deposit Work Of Carborundum |
| Last Date For Submission | 6th Aug, 2026 |
| Opening Date | 11 Aug, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 10610388.00 |
| City | Kalamassery |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Paving out, stringing and tensioning as per standard one OPGW including fixing the conductors on to the tower tops using tension clamps and suspension clamps , jumpering the conductor at tension points , jointing of conductor where evre necessary, erection of earth bonds, hire charges for pulling machines, tractors and stringing tools, all hire and labour for protective trestles and providing suitable back strings at the time of stringing etc complete. | 1.2 | km |
| 2 | Providing droppers and connecting to lines / equipments or jumper between two buses with necessary suspension insulators for 33kV/66kV/110kV/220kV using ACSR Moose/ Kundah/ wolf Single conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase) | 18 | E |
| 3 | Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 100 | hr |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 320 | cub.m |
| 5 | Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 145 | cub.m |
8 Days Left