Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Department Of Atomic Energy
Tender ID4206191
Organisation NameDepartment Of Atomic Energy
Tender BriefCorrigendum : Construction Of Bus Terminal And Allied Facilities In Kalpakkam Township.
Last Date For Submission1st Jun, 2026
Opening Date02 Jun, 2026
Cost
Document Cost0.00
EMD388300.00
Estimated Cost19415000.00
Location
CityKalpakkam
StateTamil Nadu

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork excavation by mechanical means (Hydraulic excavator) / manual means for foundations, trenches, etc., not exceeding 1.5m in width or 10 sqm on plan in hard gravelly soil and other types of soil including shoring, strutting, bailing of water, if necessary, dressing of sides, levelling and ramming the bottom of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus earth (Disposed soil to be levelled by breaking clods, if any and neatly dressed) stacking the excavated material away from edge of trenches within a lead of 50 metres, etc., all complete as per specifications and as directed by the Engineer-in-charge. (Note: Only plan dimension of the foundation concrete shall be measured for payment except for under ground water proofing.)
2All kinds of soil upto 1.50mtr depth450.00Cu.m
3All kinds of soil exceeding 1.50 mtr depth but not exceeding 3.00 mtr depth150.00Cu.m
4Excavating trenches of required width by mechanical means (Hydraulic excavator)/ manual means for pipes, cables etc., for depth upto 1.5m in all kinds of soil including excavation for sockets, dressing of sides, ramming of bottoms, getting out the excavated soil and then refilling the soil as required in layers not exceeding 200mm in depth, consolidating each deposited layer by ramming, watering etc., and disposing of surplus excavated soil as directed within a lead of 50m, (Disposed soil to be levelled by breaking clods, if any and neatly dressed) etc., all complete as per specification.580.00Cu.m
5Filling available selected excavated earth (excluding rock) available at site in trenches, plinth, sides of foundation, etc., in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming and watering, levelling and dressing the top surface, lead upto 1 Km and lift upto 1.5m etc., all complete as per specification.200.00Cu.m
1st Jun, 2026

5 Days Left

WhatsApp