Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4206191 |
|---|---|
| Organisation Name | Department Of Atomic Energy |
| Tender Brief | Corrigendum : Construction Of Bus Terminal And Allied Facilities In Kalpakkam Township. |
| Last Date For Submission | 1st Jun, 2026 |
| Opening Date | 02 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 388300.00 |
| Estimated Cost | 19415000.00 |
| City | Kalpakkam |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork excavation by mechanical means (Hydraulic excavator) / manual means for foundations, trenches, etc., not exceeding 1.5m in width or 10 sqm on plan in hard gravelly soil and other types of soil including shoring, strutting, bailing of water, if necessary, dressing of sides, levelling and ramming the bottom of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus earth (Disposed soil to be levelled by breaking clods, if any and neatly dressed) stacking the excavated material away from edge of trenches within a lead of 50 metres, etc., all complete as per specifications and as directed by the Engineer-in-charge. (Note: Only plan dimension of the foundation concrete shall be measured for payment except for under ground water proofing.) | ||
| 2 | All kinds of soil upto 1.50mtr depth | 450.00 | Cu.m |
| 3 | All kinds of soil exceeding 1.50 mtr depth but not exceeding 3.00 mtr depth | 150.00 | Cu.m |
| 4 | Excavating trenches of required width by mechanical means (Hydraulic excavator)/ manual means for pipes, cables etc., for depth upto 1.5m in all kinds of soil including excavation for sockets, dressing of sides, ramming of bottoms, getting out the excavated soil and then refilling the soil as required in layers not exceeding 200mm in depth, consolidating each deposited layer by ramming, watering etc., and disposing of surplus excavated soil as directed within a lead of 50m, (Disposed soil to be levelled by breaking clods, if any and neatly dressed) etc., all complete as per specification. | 580.00 | Cu.m |
| 5 | Filling available selected excavated earth (excluding rock) available at site in trenches, plinth, sides of foundation, etc., in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming and watering, levelling and dressing the top surface, lead upto 1 Km and lift upto 1.5m etc., all complete as per specification. | 200.00 | Cu.m |
5 Days Left