| Tender ID | 4592613 |
|---|---|
| Organisation Name | Indira Gandhi Centre For Atomic Research |
| Tender Brief | Corrigendum : Development Landscape With Solar Compass In Front Of Hbb Area In Igcar At Kalpakkam. |
| Last Date For Submission | 8th Jul, 2026 |
| Opening Date | 09 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 140260.00 |
| Estimated Cost | 7013000.00 |
| City | Kalpakkam |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork excavation by manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-Charge. | ||
| 2 | All kinds of soil with depth upto 1.5m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres. | 200 | Cu.m. |
| 3 | Filling with selected excavated earth available at site upto a lead of 200m, filling in layer of not more than 150mm thickness, each layer well rammed and consolidated by hand/earth rammer including excavation of dumped earth, hire charges of rammer, water consolidation, levelling to proper gradient, dressing the top surface to the required level, complying with specification and all as directed by the Engineer-in-Charge. | 550 | Cu.m. |
| 4 | Collection, supplying and stacking good quality Red earth without stones, gravel etc., and stacking for premeasurement at places as shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100metres and filling in pits etc., complete all as per specification and as directed by the Engineer-in-Charge. | 270 | Cu.m. |
| 5 | Collection, supplying and stacking of Decomposed dry farmyard manure without undesirable materials, stacking the same to at places as shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100metres and filling in pits etc., complete all as per specification and as directed by the Engineer-in-charge. | 350 | Cu.m. |