Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Bhabha Atomic Research Centre
Tender ID4522537
Organisation NameBhabha Atomic Research Centre
Tender BriefCorrigendum : Fabrication And Erection Of Rcc Hatch Blocks And Stainless Steel Handrail For Staircases In Wmp At Frfcf Project Site At Kalpakkam
Last Date For Submission30th Jun, 2026
Opening Date08 Jul, 2026
Cost
Document Cost0.00
EMD495885.00
Estimated Cost24794272.00
Location
CityKalpakkam
StateTamil Nadu

Register to see full details

BOQ Items
#ItemQtyUnits
1Manufacturing, supplying, hoisting and fixing in position at all lifts, precast units of various patterns and sizes for precast plain solid units, slabs, etc, in controlled reinforced cement concrete of M30 grade using 380 kg/cum of PPC, 20mm and below machine crushed graded stone aggregate including making perforations in precast slab as per drawing weigh batching, mechanical mixing, casting, vibrating, finishing of exposed faces, curing, necessary formwork, moulds, transporting and placing at all lifts, preparation of connections, grouting with cement mortar/cement grout wherever needed excluding steel reinforcement complete all as per drawing, specification and as directed by Engineer. Note: 1. The rate of concrete shall include all labour, equipment, charges for mixing & cost of admixture. Polycarboxylate ether (PCE) based chemical admixture confirming to IS 9103 shall be mixed in fresh concrete and prior permission from engineer-in-charge shall be obtained for dosage and compatibility. 2. Test certificate of cement, procured from dealer/company to be submitted for all cement related works by the Contractor. 3. The rate shall be quoted on the basis of using minimum cement per cu.m. of concrete mentioned below for relevant grade of concrete. Any upward/ downward variation required to obtain the specified strength will be paid for or deducted at the rate of cement specified in Schedule F. 4. Rate shall also include Transportation of the casted RCC hatch blocks and placing in position within the tolerances specified in drawings or specifications. 5. EOT Crane available in the building shall be utilised for Lifting and positioning the hatch blocks. 6. Hatch covers are available at various elevation within cells from floor level to maximum height of 17m. 7. Rate is including of all temporary scaffoldings, staging within the rooms as necessary for the work.240.00Cu.m
2Providing and fixing double Tubular scaffolding system using H-Frames / APS system or (cup lock type) on the exterior side upto seven story height made with 40mm dia M.S. tube 1.5m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runers, conection with building etc. wherever required for inspection of work at required locations with essential safely features for the workmen etc. complete as per directions and as approved by the Engineer-in-charge. The elevation area of the scaffolding shall be measured for payment purposes. The payment shall be made once irrespective of duration of scaffolding. Note: Once the scope of work envisaged in this contract is completed in one location, the scaffolding shall be removed and considered NOT REQUIRED again. Bidders shall quote accordingly.1600.00Sq.m
3Providing straightening, decoiling wherever necessary bending, cutting, binding and fixing in position steel reinforcement TMT bars of Fe500D grade steel conforming to IS:1786 and tying with approved annealed binding wire of 1.6mm dia in all reinforced cement concrete work at all lifts, including cost of supplying and fixing the spacer/cover blocks and binding wire complete all as per specification and as directed by Engineer-in-Charge at all lifts. Note: The rate shall be including the cost and testing of reinforcement steel at thrid party NABL lab. The reinforcement steel will be procured from dealers with a test certificate as approved by the department. For further details please see Clause 12 of Section VIII, General Information for Guidance of Tenderers.60.00MT
4Providing, supplying, cutting, bending to shape, welding, fabricating, hoisting, placing and fixing in position structural steel members like MS structural embedment's/pipe and sleeves/penetration etc. Using MS angles, channels, I-sections, plates, tees, flats, rounds, square sections etc. including chamfering and rounding off the edges, applying a coat of Red lead paint primer / Zinc chromate primer of approved make and 2 coats of flat oil paint / sythetic enamel paint of approved colour and make, scaffolding and staging required for fabrication as well as erection complete all as per specifications, drawings and as directed by the Engineer-in-charge. Note: Lifting device arrangements if any required also arranged by the contractor at his own cost.27.00MT
5Supply, placing and levelling in position of lifting ring conforming IS 2760 or equivalent in concrete works by providing and using steel templates wherever required, including tools, tackles and equipment etc.., complete for all elevation as per drawings, specifications and as directed by Engineer in-charge. Note : 1. The material of lifting ring is Alloy steel grade 80 only and it is elliptical in shape. Size will be determined based on the weight of the hatch to be casted. 2. Material and Safe Working load test certificate is required for all rings.308.00Each
30th Jun, 2026

6 Days Left

WhatsApp