Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Indira Gandhi Centre For Atomic Research
Tender ID4498793
Organisation NameIndira Gandhi Centre For Atomic Research
Tender BriefCorrigendum : Providing Eps For Fixing The Under Slung Crane And Other Civil Works Around Ustf Building At Igcar, Kalpakkam.
Last Date For Submission1st Jul, 2026
Opening Date02 Jul, 2026
Cost
Document Cost0.00
EMD28400.00
Estimated Cost1420000.00
Location
CityKalpakkam
StateTamil Nadu

Register to see full details

BOQ Items
#ItemQtyUnits
1Providing, supplying, cutting, bending to shape, welding, fabricating, hoisting, placing and fixing in position structural steel members like MS structural embedment s/pipe and sleeves/penetration etc. using MS angles, channels, I-sections, plates, tees, flats, rounds, sag rod, square sections etc. including chamfering and rounding off the edges, applying painting as described below of approved colour and make, scaffolding and staging required for fabrication as well as erection complete all as per specifications, drawings and as directed by the Engineer-in-charge. Note: 1. Lifting device arrangements if any required also arranged by the contractor at his own cost. 2. Painting two coats of polyurethane paint with one under coat of suitable Epoxy/PU primer of approved make and colour as directed by the Engineer-in-Charge.1M.T.
2Providing and fixing of anchor bolt at all levels Hilti or approved equivalent in to RCC beams, columns, slab and other RCC members of below mentioned anchor bold grade, anchor size and anchor length including drilling, cleaning of drilled hole, injecting / grouting with Injectable epoxy mortar suitable for rebar connections and heavy-duty anchoring HIT-RE 500 V4 or approved equivalent inclusive of all machinery and man power, etc. complete all as directed by the Engineer-in-Charge. Note : Scaffolding will be paid separately under relevant item.
3M16 Anchor rod HAS 8.8 of 400mm lenght with 250mm embedment depth, Hilti Product No. 2390179, Zinc-plated Ultimate-performance pre-set undercut anchor for dynamic loads from Hilti or approved equivalent with M16 CLASS 8 having 1 Nut(DIN 934) + 1 Washer (DIN 125), Hilti Product No. 3491436 for each bolts and Injectable mortar HIT-RE 500 V4/500,Hilti Product No. 2287554 assuming 32ml mortar volume per anchor.72Nos.
4Providing and fixing double Tubular scaffolding system using H-Frames / APS system or (cup lock type) on the exterior side made with 40mm dia M.S. tube 1.5m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in-Charge. Note : 1. The elevation area of the scaffolding shall be measured for payment purposes. 2. The payment shall be made once irrespective of duration of scaffolding. 3. The scaffolding system drawing shall be got approved by Engineer-in-Charge. 4. The contractor has to observe all safety procedure while working on heights as per I.S. 3696 (Part-I) (Safety Code for scaffolds). 5. Screen of suitable material shall be provided to the full height of scaffolding and securely tied to protect falling objects coming out during the work is in progress. 6. Necessary aluminium / M.S. ladder shall be provided at the cost of the contractor, to the full height of scaffolding at required location around the building to enable Departmental Supervisor/Engineer climb up and closely watch the repair work of the building.725Sq.m.
5Providing and applying painting One coat at all levels with premium Plastic emulsion paint of (Asian or Equivalent approved brand, colour and manufacturer) to give an even shade including preparation of the surfaces, applying putty (putty for touch up to fill up crevices, mild depression etc.), scaffolding complete all as per specifications and as directed by the Engineer-in-Charge.1250Sq.m.
1st Jul, 2026

12 Days Left

WhatsApp