Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3899335 |
|---|---|
| Organisation Name | Indira Gandhi Centre For Atomic Research |
| Tender Brief | Corrigendum : Structural Retrofitting, Waterproofing And Allied Painting Works In Augf Building At Igcar, Kalpakkam. |
| Last Date For Submission | 29th Apr, 2026 |
| Opening Date | 30 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 62700.00 |
| Estimated Cost | 3135000.00 |
| City | Kalpakkam |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling Plain Cement concrete by manually / by mechanical means at all levels, carefully without damaging adjacent structures including disposal of debris with 50m lead, labour, tools required etc. complete in all respects as per specifications and directed by the Engineer-in-charge. | 2 | Cu.m. |
| 2 | Dismantling of RCC works at all levels by manually / by mechanical means, including Cutting and stacking of steel reinforcement bars and disposal of unserviceable materials within 50m lead as per specifications and directed by the Engineer-in-charge. | 6 | Cu.m. |
| 3 | Dismantling brick work in cement mortar at all levels by manually / by mechanical means, carefully without damaging adjacent structures including stacking of serviceable materials and disposal of unserviceable materials within 50m lead all as per specifications and directed by the Engineer-in-charge. | 1 | Cu.m. |
| 4 | Dismantling old weather proofing materials such as brick bat coba or foam and screed concrete at all levels and cleaning the surface including disposal of rubbish to the dumping yard within 50 metres lead all as per specifications and directed by the Engineer-in-charge. | 83 | Cu.m. |
| 5 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-in-Charge for the following. |
13 Days Left