Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4034519 |
|---|---|
| Organisation Name | Indira Gandhi Centre For Atomic Research |
| Tender Brief | Operation And Maintenance Of Tertiary Treatment Plant At Igcar, Kalpakkam For The Year 2026-27 |
| Last Date For Submission | 5th May, 2026 |
| Opening Date | 06 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 76680.00 |
| Estimated Cost | 3834000.00 |
| City | Kalpakkam |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Operation & Maintenance of Tertiary Treatment Plant : Providing two shift operation & maintenance of two skids of UF & RO system of the tertiary treatment plant. The following activities to be carried out; Automatic operation of UF skids and RO skids using PLC and HMI, automatic backwash of UF systems, chemical enhaced backwash of UF systems, adjusting operation cycle and backwash duration of UF system as required, Operation of RO skids, Chemical cleaning of RO membranes, Controlling of all chemical dosages as per the process requirement, maintain the stock of chemicals,to measure and record plant parameters, to maintain operation and maintenance log book, to maintain the required pH and Conductivity of RO permeate water and pumping to cooling tower of chilling plant,Operation of chemical laboratory and maintenance of the system. The detailed scope of work is indicated in Section V. NOTE: 1) Total operation is 330 days x 4 operations per day = 1320 operations. 2) Rate shall be quoted for each operations for a net working time of 8 hours per day for one highly skilled worker. | 1320 | No of operation |
| 2 | Operation & Maintenance of Tertiary Treatment Plant : Providing two shift operation & maintenance of two skids of UF & RO system of the tertiary treatment plant . The shift operator has to carry out the following activities; backwash of multimemdia filter/ disc filter at the end of every day, chemical preparation and carrying out chemical cleaning of UF and RO membranes, preparation and loading of chemicals, to maintain and monitor the chemical levels in all dosing tanks, operation of pumps and compressors, carrying out preventive maintenance of mechanical and electrical equipment and instruments, monitoring the tank level in all process tanks, assesing the condition of cartridge filter and replacement of cartridge filters and to carry out cleaning and repair works. The detailed scope of work is indicated in Section V. NOTE: 1) Total operation is 330 days x 2 operations per day = 660 operations. 2) Rate shall be quoted for each operations for a net working time of 8 hours per day for one skilled worker. | 660 | No of operation |
| 3 | Providing and dosing 12% concentrated Sodium hypochlorite solution (25/35 litre plastic carboys) for chlorination of STP feed water including transportation and delivery charges at site . The detailed specification is indicated in Section-V. | 8540 | litre |
| 4 | Providing and dosing 48% concentrated NaOH solution (25/35 litre plastic carboys) for chemical cleaning and pH adjustment including transportation and delivery charges at site. The detailed specification is indicated in Section-V. | 2520 | litre |
| 5 | Providing and dosing 33% concentrated HCL solution (25/35 litre plastic carboys) for chemical cleaning and pH adjustment including transportation and delivery charges at site. The detailed specification is indicated in Section-V. | 2520 | litre |
17 Days Left