Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4029734 |
|---|---|
| Organisation Name | Indira Gandhi Centre For Atomic Research |
| Tender Brief | Revamping Of Hot Cell Exhaust Duct At Rcl, Igcar, Kalpakkam |
| Last Date For Submission | 6th May, 2026 |
| Opening Date | 11 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 115052.00 |
| Estimated Cost | 5752604.00 |
| City | Kalpakkam |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Safe dismantling, gas cutting and removal of old mild steel ducts/pipes/supports/exhaust HEPA filter bank/Butterfly valves, etc. This work includes wall/floor breaking, cutting, dismantling, removal of cement plastering, decontamination, cutting into small pieces, transporting and handover the removed materials to Central Stores as directed by the Engineer in-charge. Transportation of above removed materials (within 2km distance) by means of any vehicle from site to Central Stores is contractor's scope. | 3000 | Kgs |
| 2 | Handling and erection of 500 NB SS 304L pipe at 7.0 mtrs above ground using Hydra crane/ Scaffolding system. | 70 | Meter |
| 3 | Fabrication installation, testing and commissioning of SS 304L pipe. Butt welding of SS 304L pipe using TIG process with suitable electrode/filler wire of approved makes, Liquid penetrant (LP) examination of root and final weld passes as per specifications. As per ASME section VIII, Pneumatic test to 0.5 kg/cm after final completion. (500 NB SS 304L pipe will be supplied by department as free issue material) Ref: IGC/MC&MFCG/CFED/RFS/HC Duct/2025/01 | 1500 | Inche dia |
| 4 | Supply & erection of Seamless 500 NB SS 304L Sch 10 weldable elbow (Size 508.0 mm OD x 5.54 mm thick) as per specification. | 7 | Nos |
| 5 | Earth excavation and refilling: Manual earth excavation in all kindly of soil, refilling after work completion. This includes removal of shrubs, vegetation, roots and rocks along the trunch and disposal to identified location and de-watering the trench where ever necessary. | 50 | m3 |
18 Days Left