Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4595995 |
|---|---|
| Organisation Name | Forest Department |
| Tender Brief | Corrigendum : Retender Board Making Chembra Peak Vsss Under Meppady Range |
| Last Date For Submission | 22nd Jun, 2026 |
| Opening Date | 24 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 4659.00 |
| Estimated Cost | 186354.00 |
| City | Kalpetta |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Board | ||
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including gettin i out the excavated soil and disposdl of siirplus excavated soil.as directed, withir a lead of 50 m.All kinds of soil | 3.704 | cum |
| 3 | Proviiling and laying in position cement concrete of specified grade excluding the cost oil centering and sbuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natuml sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.712 | cum |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: I:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nomin:il size derived from natural sources) | 3.952 | cum |
| 5 | Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 3.200 | sqm |
1 Days Left