Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Health Engineering Department
Tender ID5027203
Organisation NamePublic Health Engineering Department
Tender BriefRestoration Of Damage Pipeline Due To Widening Strengthening And Construction Of Surface Water Drain Of Wbhdcl And Pwd Roads At Different Location Of Chakdah Block Under Nadia Arsenic Division I Phe Dte
Last Date For Submission7th Aug, 2026
Opening Date10 Aug, 2026
Cost
Document Cost300.00
EMD57497.00
Estimated Cost2874860.00
Location
CityKalyani
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. i) Manufacturer s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves. a) 125mm OD UPVC line460.0000mtr
2b) 160mm OD upvc line1900.0000mtr
3Supply & delivery of internal diameter M.S. Pipe of wall thickness 9.5 mm of TATA/SAIL make (spirally welded) as per IS 3589-2001 or as ammended to be delevered at site inclusive of all duties, taxes charges and cost of transporation, loading & unloading & stacking all complete at lifting and destination points all complete as per the direction of E.I.C.( 8 mm thick ) a) 200 mm dia (Rs 3128.32 for suuply and Rs 221.26 for lowering)24.0000mtr
4Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) B) Do- by fine sand.60.0000%cum
5Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) upto 150 mm. Thick10.0000cum
7th Aug, 2026

17 Days Left