Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3793824 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repairs To Sunken Slab, Dpc, Att, Roof Treatment And Other Miscellaneous Works At Fort Area Nagpur Under Ge Kamptee |
| Last Date For Submission | 18th Apr, 2026 |
| Opening Date | 20 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 40000.00 |
| Estimated Cost | 2000000.00 |
| City | KAMPTEE |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Material and labour for providing anti-termite treatment (Post Construction) along the external wall below concrete apron/ plinth protection using chemical emulsion (for using Chloropyriohos emulsifiable concentrates conforming to IS-8944 - 2005) @ 2.25 Litre per linear metre, the hole 300mm apart including drilling and plugging 12mm dia holes with cement mortar (1:2) to match with the existing floors complete all as specified and directed. (Note : To dilute chemical of 20 percent concentration, 19 parts of water to one part of the chemical shall be added to achieve 1 (one) percent concentration.) | 800.00 | RM |
| 2 | Material and labour for providing anti-termite treatment (Post Construction) under existing floors using chemical emulsion (for using Chloropyriohos emulsifiable concentrates conforming to IS-8944 - 2005) @1.00 Litre per hole. 300mm apart including drilling and plugging 12mm dia holes with CM (1:2) to match with the existing floors complete all as specified and directed. (Note : To dilute chemical of 20 percent concentration, 19 parts of water to one part of the chemical shall be added to achieve 1 (one) percent concentration.) | 80.00 | Sqm |
| 3 | Material and labour for providing anti-termite treatment (Post Construction) at point of contact of wood work with floor or wall, using chemical emulsion (in oil or kerosene based solution of Chloropyriohos 1.0% by weight concentration shall be used for treatment of wood or wood based products) @ 0.50 Litre per hole by drilling 6mm dia holes at a downward angle angle of 45 at 150 centre to centre and sealing with CM (1:2) to match with the existing surface complete all as specified and directed. (Note : To dilute chemical of 20 percent concentration, 19 parts of oil or kerosene to one part of the chemical shall be added to achieve 1 (one) percent concentration.) | 100.00 | RM |
| 4 | Taking down cement plaster of any description including racking out joints hacking for key, scrubbing down with water etc complete all as specified and directed. | 430.00 | Sqm |
| 5 | M&L Rendering 10 mm thick internal using cement plaster in CM 1:6 on fair faces of brick/concrete work surfaces to be finished even and smooth (without using extra lime or cement complete all as specified and directed. | 200.00 | Sqm |
6 Days Left