Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4069233 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Static Tank Display And Surrounding Area Of Educational Awareness Park At Mil Station Kanchrapara Under Ge Barrackpore |
| Last Date For Submission | 19th May, 2026 |
| Opening Date | 21 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 64200.00 |
| Estimated Cost | 3210000.00 |
| City | Kanchrapara |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in trenches not exc 1.50 m wide and not exc 1.50 m deep for foundation, laying of pipe or for shafts, wells cesspits, man holes, pier holes, laying of cable etc not exc 10 Sqm on plan and n exc 1.5m in depth and getting out in soft / loose soil complete all as specified and as directed. | 52.00 | Cum |
| 2 | Bringing approved earth (as approved by Garrison Engineer) from sources outside defence land including all costs such as royalty if any transportation taxes etc. for area filling / forming including raising earth spreading in layers not exc 30 cm thick each layer, watering, compaction with 8 tonne to 12 tonne power roller and finished to required size and shape etc, any high / depth from EGL. Notes:- (i) Earth required for the item shall be supplied by contractor out side MOD land of any lead at his own arrangement. (ii) All cost of procurement of earth including cost of transportation, compaction, royalties, tax etc. shall be deemed to be included in the unit rate quoted by the contractor. (iii) with reference to clause 3.6 of MES schedule Part-II on serial page no- 21 it is clarified that measurement of the above item shall be finished embankment/ traverse of filled earth after consolidation/ compaction and 5% deduction shall be made from measured and calculated volume to allow for increase in bulk. (iv) Extra Soil obtain from excavation of trenches shall be use as earth filling without any extra cost. (v) Total quantity/ partial of earth may not be available in Barrackpore area. The contractor shall bring the earth outside area it is advised to quoted the rate considering availability of soil and its lead involved complete all as specified and as directed. | 400.00 | Cum |
| 3 | Demolition of plain cement concrete in ground floors and pavings not exceeding 15 cm thickness (below or above ground level) complete all as specified and as directed. | 2.00 | Cum |
| 4 | Demolition of plain cement concrete in ground floors and pavings exceeding 15 cm thickness (below or above ground level) complete all as specified and as directed. | 47.00 | Cum |
| 5 | Supply and laying hardcore materials (Broken bricks) of size n.exc 63mm for loose filling to makeup depressions etc complete and deposited where as specified and as directed. | 34.00 | Cum |
6 Days Left