Tendering Authority: Deendayal Port Trust
Tender ID3713761
Organisation NameDeendayal Port Trust
Tender BriefCorrigendum : Design, Supply, Installation, Integration, Testing & Commissioning Of Metal Hydride Technology Based Green Hydrogen Storage System And Fuel Cell Based Power Generation For Port Applications At Deendayal Port Authority, Kandla
Last Date For Submission13th Apr, 2026
Opening DateRefer to Documents
Cost
Document Cost5900.00
EMD651045.00
Estimated Cost32552239.00
Location
CityKandla
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
1Supply of Metal Hydride Technology based storage system for min 3Kgs of hydrogen gas storage along with all necessary statutory certification including but not limited to all piping valves fittings filters gauges control and safety devices essential components etc required for successful commissioning and smooth operation of system complete in all respect as per scope of work1.000LS
2Supply of continuous power Fuel Cell of suitable capacity to generate single and three phase power output of minimum 4 kW compatible with hydrogen taped from the metal hydride based storage along with all necessary statutory certification including but not limited to power distribution breaker batteries communication interfaces redundancy all piping valves fittings gauges control and safety devices essential components plug and play etc required for successful commissioning and smooth operation of system complete incomplete in all respect as per scope of work1.000LS
3Installation Integration among metal hydride storage system fuel cell system and existing Green Hydrogen generation plant Testing Trials Commissioning Performance Testing complete in all respect for smooth operation of system as per scope of work1.000LS
4Supply of Metal Hydride Technology based storage system for min 3Kgs of hydrogen gas storage along with all necessary statutory certification including but not limited to all piping valves fittings filters gauges control and safety devices essential components etc required for successful commissioning and smooth operation of system complete in all respect as per scope of work1.000LS
5Supply of continuous power Fuel Cell of suitable capacity to generate single and three phase power output of minimum 4 kW compatible with hydrogen taped from the metal hydride based storage along with all necessary statutory certification including but not limited to power distribution breaker batteries communication interfaces redundancy all piping valves fittings gauges control and safety devices essential components plug and play etc required for successful commissioning and smooth operation of system complete incomplete in all respect as per scope of work1.000LS
13th Apr, 2026