Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4202891 |
|---|---|
| Organisation Name | Deendayal Port Trust |
| Tender Brief | Corrigendum : Providing Common Approach Road Connectivity For Proposed Green Hydrogen Plots At Old Kandla (phase-i) |
| Last Date For Submission | 16th Jun, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 5900.00 |
|---|---|
| EMD | 14340046.00 |
| Estimated Cost | 717002319.00 |
| City | Kandla |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | "Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 6744.000 | M3 |
| 2 | Providing primary rock of 0.1 to 0.5T for road work/ground including cost of quarrying, royalty, loading, unloading, transportation and spreading in layers from existing ground to required level, levelling, dressing side slopes etc., complete with all labour and materials etc., as directed by the engineer in charge. | 473970.000 | MT |
| 3 | Supplying and stacking of quarry spall /Ganular material for emabnakement of Approach roads/plot with including cost of excavation, royalty, loding, unloding transportation complete with all labour and materials or as directed by Engineer in Charge. | 680000.000 | MT |
| 4 | Laying,spreading,compacting and shifting of Quarry Spalls material with loading, unloading and tranasproting. The material shall be spread in uniform thicness and compacted in layers using vibratory rollers of 8-10 capacity with watering to achivce proper grade and camber. The work shall include consolidation to meet specified compaction values and surface accuracy,complete in all respects as directed by the EIC | 425000.000 | M3 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1283.000 | M3 |
11 Days Left