| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains of soil in all kinds of soils, soft and hard rocks and saturated soil, de-watering, including wedging out rocks where blasting work is prohibited, chiseling or any other mixed variety of soil, including shoring, strutting or bailing out water upto any depth or any height quantum of water including de-watering removal of slush and stacking the serviceable and un-serviceable material clear from the edge of excavation as per direction of Engineer-in-Charge and returning the stacked soil in 15cm (Fifteen centimeter) layers, when required into plinths, sides of foundation etcetera consolidating each deposited layer by ramming, watering and then disposing of all excavated earth including carriage of material within all leads, lifts and other incidentals as per approved drawing, design and as directed by the Engineer-Incharge. The rate is inclusive of octroi, royality, Malkana, Toll tax, sale tax, GST and any other taxes imposed by the Government. | 318.80 | Cubic meter |
| 2 | Providing and laying mechanically mixed and vibrated concrete for plain cement concrete Grade M-10 (M-Ten) nominal mix 1:3:6 (One cement isto three sand isto six graded crushed stone aggregate 20mm (Twenty millimeter) nominal size), in or under water in open foundation for all type of structures and in drains, / Under floor Slab Culverts / pipe culverts and the like etcetera complete including pumping or bailing out water, dewatering (surface/sub soil water)including removal of slush which may arise at time of laying under water for all heights/depths and any quantum of water, including cost of form work and curing complete for 14 (fourteen) days and as per drawing and MORD Technical specification section 800, 900 & 1200 and as per entire satisfaction and directions of Engineer-in-charge, including carriage of materials within all leads, lifts and other incidentals. The rates is including Royality, Malkana, Octroi, toll tax, sale tax, GST or any other taxes imposed by the Government. | 227.44 | Cubic meter |
| 3 | Providing and laying mechanically mixed and vibrated concrete for plain cement/reinforcement concrete in sub structure Grade M-15 (M-Fifteen) Nominal mix 1:2 :5 (one cement isto two and half sand isto five graded crushed stone aggregate (40mm) forty millimeter nominal size) including pumping or bailing out water/ dewatering (surface and sub-soil water) and removal of the slush which may arise at the time of laying concrete, for all heights/depths and any quantum of water, in Toe wall and parapets etcetera including cost of form work and curing complete as per MORD technical specification section 800, 900 & 1200 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidentals. The rate is including Octroi, Royality, Malkana, GST, toll tax or any other taxes imposed by the Government. | 77.54 | Cubic meter |
| 4 | Providing and laying mechanically mixed and vibrated Plain/reinforced cement concrete Grade-M-20 (M-Twenty) design mix with cement contents not less than @ 350 kg (three hundered fifty cubic metre) with 20mm (twenty millimeter) nominal size graded crushed stone aggregate in Bed Block, dirt wall and the like etcetera for all heights, including cost of form work and curing complete but excluding the cost of reinforcement for reinforced work as per MORD technical specification section 800,900 and 1200 and as per the direction and the entire satisfaction of Engineer-in-Charge complete including carriage of materials with in all leads, lifts and other incidentals. The rates is including Royality, Malkana, Octroi, toll tax, sale tax, GST or any other taxes imposed by the Government. | 2.86 | Cubic meter |
| 5 | Providing and laying in position Tor steel/ reinforcement in Super-Structures of TATA TISCON /SAIL/JINDAL-PANTHER/ SHAYAM steel make of thermo mechanically coated bars of grade Fe 500D for Reinforced Cement Concrete work complete as per drawing and MORD 1000 and 1400 including cutting , bending, binding and placing in position complete including cost of binding wire and other incidentals for its completion upto any floor level and as per the directions of the Engineer-in-Charge including carriage of materials within all leads, lifts and other incidental. The rate is including of Octroi, Royality, Malkhana, Toll Tax, Sale Tax, GST or other Taxes imposed by the Government. | 1.10 | Tonne |