Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Himachal Pradesh Irrigation And Public Health Department
Tender ID3888166
Organisation NameHimachal Pradesh Irrigation And Public Health Department
Tender BriefReconstruction Of Damaged Tanks And Other Civil Allied Accessories Of The Scheme Under Pdna
Last Date For Submission6th Apr, 2026
Opening Date07 Apr, 2026
Cost
Document Cost2000.00
EMD89060.00
Estimated Cost4155699.00
Location
CityKangra
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation in foundation trenches etc in earth work lift up to 1.50 mtrs stacking the excavated soil not more than 3 mtrs clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinths,sides of foundation etc, consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20 mtrs pick jumper work 50% each. .complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .136.39Cum
2P/L cement concrete 1 : 3 : 6 (1 cement : 3 sand : 6 graded stone aggregate 40 mm nominal size) & curing complete in foundation & plinth..complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .2.94Cum
3Providing & laying cement concrete 1: 4 :8 (1cement : 4 sand : 8 graded stone aggregate 40 mm nominal size) and curiing complete exeludidng the cost of form work in foundation & plinth..complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .12.45Cum
4Providing and laying cement concrete 1:6:12 (1 cement :6 sand :12 graded stone agg. 40mm nominal size) On curing complete excluding cost of form work in foundation and plinth complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .2.99Cum
5Providing and Laying cement concrete 1:5:10(1 cement:5 sand:10 approvedgraded stone aggregate 40mm(Forty milimetres nominal size)with 15% plum and curing compolete excluding the cost of form work in retaining wall/breast wall. The size of plum shall usually 150mm to 300mm as per HPPWD specification complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .72.36Cum
6th Apr, 2026

5 Days Left

WhatsApp