Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4852295 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Restoration Of Rain Damages On Gallu Ghaneta Baba Kirpa Road ( Under Pdna) |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 13 Jul, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 9900.00 |
| Estimated Cost | 495660.00 |
| City | Kangra |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | P/L CC Work in Km 0/060 to 0/170, 0/630 to 0/650 | ||
| 2 | Providing, laying, Soling 90 to 45mm ( Ninety to forty five millimetre) nominal size Grading-1, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 Kn. Static roller in stages to proper grade and camber, applying and brooming, stone screening/ binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per technical specification Clasue 405 as per directions of Engineer-in-charge including carriage of materials, within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 39.65 | Per Cubic metre |
| 3 | Providing and laying mechanically mixed and vibrated reinforced cement concrete Grade- M-25 (M-Twenty Five) in open foundation design mix with cement contents not less than 400 kg (Four hundred kilogram) per cubic metre using graded crushed stone aggregate 20mm (twenty millimetre) nominal size complete as per drawings and MORD technical specification section 800, 900 and 1400, including the cost of form work and curing complete including hauling of materials with in all leads, lifts and other incidental and as per the entire satisfaction and directions of Engineer-in-Charge. The rate is including of octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. | 59.48 | Per Cubic metre |
6 Days Left