Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4273840 |
|---|---|
| Organisation Name | Kerala Water Authority |
| Tender Brief | Corrigendum : Om-water Supply Schemes- Demolishing Of Ohsr - Mwss To Trikkarippur - Tank At Trikaripur Near Kooleri School-general Civil Work |
| Last Date For Submission | 10th Jun, 2026 |
| Opening Date | 11 Jun, 2026 |
| Document Cost | 555.00 |
|---|---|
| EMD | 4054.00 |
| Estimated Cost | 162161.00 |
| City | Kanhangad |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | WORKING CHARGES | ||
| 2 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 171.000 | sqm |
| 3 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 18.362 | cum |
| 4 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 18.362 | cum |
| 5 | 15.5:Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge. | 7.910 | sqm |
8 Days Left