| Tender ID | 3752832 |
|---|---|
| Organisation Name | Kerala State Electricity Board |
| Tender Brief | Corrigendum : Construction Of Equipment Foundation, Erecting Equipments In Connection With Constructing New 110/33kv,16mva Transformer Bay At 110kv Ss Erattupetta |
| Last Date For Submission | 17th Apr, 2026 |
| Opening Date | 20 Apr, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 3787590.00 |
| City | Kanjirappally |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. cum | 2.00 | m3 |
| 2 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge | 3.70 | M3 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 196.00 | m3 |
| 4 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock | 56.00 | m3 |
| 5 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Hard rock (blasting prohibited) | 28.00 | m3 |