Tender BriefEpoxy Grouting Work In Sluice Barrel Of Dudhawa Dam Under Mahanadi Reservoir Project In Block Narharpur, District Kanker
Last Date For Submission21st Oct, 2026
Opening Date22 Oct, 2026
Cost
Document Cost311.00
EMD209000.00
Estimated Cost41656674.69
Location
CityKanker
StateChhattisgarh

Register to see full details

BOQ Items
#ItemQtyUnits
1Sealing of cracks/ porous concrete with epoxy grout by injection through nipples complete in bucket teeth, glasics, spill way and where ever required complete. Technical specifications as per ASTM C 881 Epoxy resin bonding system (Resin and Hardener) confirming to ASTM C 881 Type IV class6,042.00KG
2Removing and hauling all kinds of soil/ soft rock including boulders up to 0.6 m. diameter slipped due to natural/ geological causes and disposing off the same in specified dump area or as directed, including cost of all materials, machinery, labour, forming steps/ ramp ways and all other ancillary operation including dewatering and pumping of the working area including all connecting operation required complete all other ancillary operations complete including all lead and all lifts for cleanliness of working area by 5hp to 10 hp diesel pump complete with all leads and lift and cost of all materials,equipment & labour, as per approved as per approved designed & drawings, specifications and as directed by the engineer-in-charge. drawings, specifications and as directed by the engineer-in-charge.731.85cum
3Epoxy bonding of new concrete to old concrete using epoxy resin painting suitable for dry and wet surface of the concrete with having minimum bond strength to concrete 2.5 MPa including preparation of old concrete surface with wire brush and compressed air, sealing of all cracks or spalling by epoxy injection of epoxy mortar or epoxy grouting as per requirement. Applying epoxy resin bond including cost of all material, machinery, T&P, labour and cost of other incidental charges and testing as per relevant specifications and all other ancillary operations including all lead and lift etc., complete. with providing and applying epoxy mortar of resin and hardener with silica sand up to 20mm thickness of sika/ forsook/ pixilate or its equivalent including proper wire brushing etc. complete as per the direction of site in charge technical specification as per ASTM C 881. Epoxy resin bonding system (Resin and Hardener) confirming to ASTM C 881 Type IV class4,050.99Square Meter
4Providing and laying M20 grade Plain Cement Concrete design mix using graded aggregate, clean, hard including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing 28 days, packing joints of shuttering and all other ancillary operations complete including all lead and lifts. Using aggregate of maximum size 20mm. etc. complete with all leads and lift and cost of all materials, equipment & labour, as per approved design & drawings, specifications and as directed by the engineer-in-charge.01.04cum
5Dismantling lime concrete or cement concrete in foundations or under floors, haunches or arches or terrace and also dismantling brick masonry including arches in lime or cement mortar and all other ancillary operations complete with all leads and lift and cost of all materials,equipment & labour, as per approved design & drawings, specifications and as directed by the engineer-in-charge.644.10cum
21st Oct, 2026