Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Rural Development Department
Tender ID5021284
Organisation NameRural Development Department
Tender BriefRepairs_to_ktw_suppling_of_needles_padali_tq.kannad_dist.chhatrapatisambhajinagar
Last Date For Submission4th Aug, 2026
Opening Date05 Aug, 2026
Cost
Document Cost2360.00
EMD12259.00
Estimated Cost1225912.00
Location
CityKannad
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Item No 01 Excavation in all kinds of soil & soft murrum including boulders upto 0.60 m diameter &0.113 cum ) for canal seating of embankment filter drains/catch water drains etc and placing excavated stuff neatly in dump area or for formation of service road/embvwnkment as directed including cost of materials machinery labour dressing bed and sides to required level and profile etc complete with lead up to 15 m and all lifts as directed313.17Cum
2Item No 02 Providing and laying in situ cement concrete of grade M-20 of trap / granite / gneiss / quartzite / graded metal for RCC works of gallery, sluice, spillway crest, spillway downstream face, energy dissipating structures, intake structures, training walls, piers, abutments, slab etc. with Concrete Mixer including shuttering and scaffolding, placing, compacting, curing with an initial lead of 1 km and all lifts etc. complete as directed. (A) M-20 (20 MSA) (Cement 6.60 bags/Cum)14.40Cum
3Item No 03 Provididng and fixing in position m.s. Needles 2.12 x 0.50 mm size as per detailed desigh and drawing including two coat of anticorrosive paint with two coats of oil paints etc complete with all leads and lifts as directed and as per specification96.00Cum
4Item No 4 Providing casing embankment using selected pervious material available directly from excavation in layerers in layers including cost of all materials , machinery, labour, all other operations such as collection of materrials ,spreading materials in layer of specified thickness ,sorting out ,breaking clods, levelling, sectioning. edges,/ sides ,watering , compacting each layer to density control of not less than 95 percents or as stippulated using vibratory compactor including cost of water etc, complete with lead upto 1 km and all lifts as directed.313.17Cum
5Insurance1.00Each
4th Aug, 2026