Tendering Authority: Local Self Government Department
Tender ID4853682
Organisation NameLocal Self Government Department
Tender BriefAnnual Plan-kuttiyattur Gp Project 159/26-27 Koovachi Kunnu Koovachi Poyil Road Rennovation Ch-0/000-0/235-koovachi Kunnu Koovachi Poyil Road Rennovation-general Civil Work-212600103700000001
Last Date For Submission13th Jul, 2026
Opening Date15 Jul, 2026
Cost
Document Cost935.00
EMD10584.00
Estimated Cost423379.00
Location
CityKannur
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Road Renovation
275.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.92.230sqm
34.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil.2.085cum
44.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead3.128cum
575.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 50220.850sqm