| Tender ID | 4853721 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Annual Plan-kuttiyattur Gp Project 123/26-27 Amincheri Motta Veahala East Lp School Road Renovation Ch 0/000 To Ch 0/540- Amincheri Motta Veahala East Lp School Road Renovation-general Civil Work-212600102600000001 |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 15 Jul, 2026 |
| Document Cost | 935.00 |
|---|---|
| EMD | 10569.00 |
| Estimated Cost | 422744.00 |
| City | Kannur |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Road Renovation | ||
| 2 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 21.000 | cum |
| 3 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4) | 21.000 | cum |
| 4 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 70.280 | sqm |
| 5 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 375.000 | sqm |