Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Irrigation Department
Tender ID3705940
Organisation NameIrrigation Department
Tender BriefCorrigendum : General-drip-phase Ii-balance Work-drip-phase Ii - Karapuzha Irrigation Project - Rehabilitation And Optimisation Of Dam And Appurtenances-general Civil Work.
Last Date For Submission2nd May, 2026
Opening Date04 May, 2026
Cost
Document Cost11500.00
EMD638000.00
Estimated Cost63737639.00
Location
CityKannur
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1APPENDIX A:-RE-SECTIONING OF THE DISTURBED DAM PROFILE AS PER DESIGN SECTION
2OD30869/2024-2025 2.29.1 : Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same.All kinds of soil33692.4570sqm
3OD30773/2024-2025 od23667/2020_2021/P1 : Earth work supplying and filling-using contractors own earth ( free from logs, stumps, rootsor any other ingredients likely to deteriorate or effect the stability of bed ) in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with vibratory power roller of minimum 8 tonnes and dressing up, in embankments including all conveyance, soil test charges,incidental charges etc; complete as per the direction of the deptl. officers at site13169.2430cum
4OD30878/2024-2025 od23669/2020_2021/P1 : Earth work supplying and filling-using available earth (Departmental earth) free from logs, stumps, rootsor any other ingredients likely to deteriorate or affect the stability of bed, in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with vibratory power roller of minimum 8 tonnes and dressing up, in embankments including all conveyance,soil test charges, incidental charges etc; complete as per the direction of the deptl. officers at site.19753.8700cum
5APPENDIX B:- RESETTING OF DISTURBED U/S RIP-RAP AND DOWN STREAM ROCK TOE
2nd May, 2026

15 Days Left

WhatsApp