Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4363800
Organisation NamePublic Works Department
Tender BriefCorrigendum : General-pre Monsoon Work 2026 Under Bridge Section Thalassery-.-general Civil Work
Last Date For Submission29th May, 2026
Opening Date01 Jun, 2026
Cost
Document Cost775.00
EMD8761.00
Estimated Cost350453.00
Location
CityKannur
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Work
2OD14031/2026-2027: Engaging Man mazdoor for Clearing the debris and vegetation from the bridge surface.80.000Day
3OD14030/2026-2027:Hire charges for Hydraulic excavator of 1 cum bucket capacity for removing excess earth from road berm and shoulder, due to slipped earth, side cutting and other reasons etc including all cost conveyance fuel and hire charges etc complete24.000hour
4OD14032/2026-2027:Jungle clearing including bushes small plants grass etc by using brush cutter removal of debris including labour charges transportation charges etc complete150.000hour
555.26a:Providing and applying elastic, elastomeric membrane forming system with anticarbonation and breathing properties. The system should be based on solvent free acrylic polymers with selected mineral fillers and should be ultra-violet resistant, crack bridging type, carbonation resistant, breathable, enviornment friendly, water proofing coating. For anticarbonation, equivalent air layer thickness denoted as R or SD CO2 grater than 50 m and for breathability equivalent air layer thickness denoted as SD H2O shall be less than 4 m for vapour transmitting barrier. The system consists of one coat primer @ 75- 100 g/m2. The consumption of main polymer coating to give film thickness of 200-225 microns (Solid contents- 70%+ -3%) should be approximately. 400-450 g/m2 per two coats depending upon the method of application (either by roller or brush) and surface smoothness of the concrete. The total dry film thickness of the coating system should be minimum 200 microns for the above system. Polymer coating should be in suitable approved shades, including cost of materials, cleaning, chipping and removing the dirt particles of the concrete slab with wire brush and water,labour charges for filling the bug holes, cracks, joints etc with one component polymer modified fine repair and cosmetic mortar, labour for applying the above coating, scaffolding charges,etc. complete as per IRC SP:80 Clause 6.5.1 and Clause 2808 in the Specifications Book for Roads & Bridges published by the Ministry during April 2013.465.000sqm
29th May, 2026

2 Days Left