Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3692914 |
|---|---|
| Organisation Name | Kerala Irrigation Infrastructure Development Corporation Limited |
| Tender Brief | Corrigendum : Kiifb-construction Of Retaining Wall For The Garden Area Of Ummenchira Rcb In Kannur District Construction Of Retaining Wall For The Garden Area Of Ummenchira Rcb In Kannur District-general Civil Work |
| Last Date For Submission | 31st Mar, 2026 |
| Opening Date | 01 Apr, 2026 |
| Document Cost | 6508.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 11323186.00 |
| City | Kannur |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of Retaining Wall | ||
| 2 | OD17086/2025-2026:Construction of cofferdam for the construction of Retaining Wall with required breadth and height, maintaining the cofferdam during construction and removing after construction etc complete ( contractor should submit the working drawing with necessary details of cofferdam and get approval of Engineer in charge before construction) | 50.000 | metre |
| 3 | OD17094/2025-2026:BAILING OUT WATER USING PUMP ABOVE 10HP AND UPTO 20HP - Bailing out water with engine and pump set above 10HP and upto 20HP, including conveyance to site and erection, cost of fuel, lubrication oil and other stores, including all operation cost etc. | 144.009 | hour |
| 4 | OD17095/2025-2026:Bailing out water using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel, lubrication oil and other stories, including all operation cost etc. | 479.920 | hour |
| 5 | 3.13.1.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Manual Means - (Depth upto 3 M) | 120.000 | cum |
2 Days Left