| Tender ID | 4611534 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Corrigendum : Construction Of Rcc Nala From Krishna Pal Singh House To Pragati Vihar Park In Keshavpurm In Ward 54 Vinayakpur Under Zone-6.(mohalla-keshavpuram) |
| Last Date For Submission | 30th Jun, 2026 |
| Opening Date | 30 Jun, 2026 |
| Document Cost | 3580.00 |
|---|---|
| EMD | 699000.00 |
| Estimated Cost | 9980000.00 |
| City | Kanpur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismentaling brick work or stone work in lime or cement mortar and including stacking of dismanteled materials as directed by Engineer cum. in-charge with in a distance of 60 meters (200 feet) | 129.60 | cum |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil directed, within a lead of 50 m including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil. | 860.40 | cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:6:12 (1 Cement: 6 Coarse sand (zone-III): 12 graded Brick aggregate 40 mm nominal size). | 133.20 | cum |
| 4 | Reinforced cement concrete work in walls (any thickness), Including attached pilasters, buttesses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finihing and reinforcement: 1:1.5:3 (1 Cement: 1.5 Coarse sand (zone-III): 3 graded stone aggregate 20 mm (nominal size). | 517.02 | cum |
| 5 | Mild steel or iron works reinforcedment concret or reinforsment brick work (when not included inoverall rates) WROUGTH to required shape as necessery Including binding kg for proper complaction of the work and including supply of steel its wastage bend hooks and etc | 34498.17 | kg |