Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4400521 |
|---|---|
| Organisation Name | Irrigation Department |
| Tender Brief | Corrigendum : Overhauling Of Rollers Of Gates And Redicon Unit, Replacing Rubber Seal, Installing Brake Lever Mechansim ,new Plummer Block And Repairing Of Jammed Plumber Block At Rasin Dam, Chitrkoot |
| Last Date For Submission | 5th Jun, 2026 |
| Opening Date | 05 Jun, 2026 |
| Document Cost | 590.00 |
|---|---|
| EMD | 63400.00 |
| Estimated Cost | 0.00 |
| City | Kanpur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Installing new Plummer Block, Gun metal Bush in place of missing one by new Bolts and other allied work including all cost of material , labour and T&P etc. for proper completion of work at Rasin Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 10.00 | Job |
| 2 | Replacement of worm wheel, Coupling and Bearing overhauling of Redicon unit with replacing gear oil, damaged packing and seal cover of Redicon unit by new gear oil, packing and seal cover including cost of all material, and other allied work, labour, T&P etc. required for proper completion of work at Rasin Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 5.00 | Job |
| 3 | Repairing of Jammed Plumber block by opening, dismantling parts, removing of old grease from GM bush, cleaning, greasing and refitting of plumber blocks including all material, labour and required T&P at Rasin Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 20.00 | Job |
| 4 | Repairing and overhauling of roller by detaching roller assembling from gate with help of jigs and fixture jacks, etc. cutting lock plate by gas cutter lifting roller assembling from gate by manila rope and shifting to woking plateform, dismantling roller assembling ,cleaning ,washing,repairing wornout roller shaft by remetaling machining ,polishing and reassembling including replacing , rubber seal, o ring, grease nipple, etc. shifting to gate and refitting in gate greasing and testing etc. by operating gate in including all cost of material , labour and T&P etc. for proper completion of work per rollerat Rasin Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 10.00 | Job |
| 5 | Replacing of bottom rubber seal size 80x20 mm as par IS code 11855 by installing new steel strip and rubber seal by making hole and surface preparation including cost of all material, labour, T&P and scaffolding required for proper completion of work at Rasin Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 5.00 | Job |
1 Days Left