Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4328310 |
|---|---|
| Organisation Name | Advanced Weapons And Equipment India Limited |
| Tender Brief | Corrigendum : Repairing/strengthening Of Make-up Pump House Lt Power Supply System By Laying Of Under Ground Lt Cables From Sms Lt Substation (a1) To Make-up Pump House (mph) And Replacement Of Mph Cfs Board/lt Panel Inside Field Gun Factory |
| Last Date For Submission | 23rd Jun, 2026 |
| Opening Date | 27 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 97900.00 |
| Estimated Cost | 4892109.00 |
| City | Kanpur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply, Installation, testing and commissioning (SITC) of LT Cubicle PCC Panel suitable for 440 Volt, 3 Phase & Neutral, 50Hz. Supply. Detail Specification and Scope as per enclosed Annexure-"A". | 1 | Each |
| 2 | Supply & Laying of XLPE insulated, armoured, heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 240 sq. Mm, 3&1/2 Core as directed by WIC & EIC. Make: Polycab, Havells, AKG, Universal, Finolex, V-Guard, NICCO. Note: Joint between cable span is not acceptable (from SMS LT Substation A-1 to Make-up Pump House LT Panel) i.e. 04 Run of cables each span length approximately 480 - 500 mtr. shall be laid in a single length without any joint in between the span. | 1920 | RM |
| 3 | Supply, Installation of Hot Dip G.I. Ladder Type cable trays minimum size: 1000mm (W) x 100 mm (H) x 14 SWG i.e. approx. 2mm (T) with G.I. coupler plates, Bends, Nut-bolts and hardware as per site requiremnt for installation on wall or MS rack at a suitable height as per site requrement and as directed by WIC & EIC. | 28 | Mtr. |
| 4 | Material and Labour for making pathway for Cables and Panel entry by removing existing door/window, cutting the wall/floor/MS trench cover, drilling hole in wall as per site requirement and re-fixing of dismantled door/window & making good as per existing arrangement with cement concrete mortar/plaster and whitewash / painting as directed by WIC & EIC. Note: All the demolished and excavated material shall be disposed off with in 500 mtr. distance as directed and complete with making good of all the rough surfaces using cement concrete mortar. | 1 | Lot |
| 5 | Area Cleaning, dejungaling, trimming of trees, removing of soil bump and scarp materials etc. from the cable route and marking/marking clear path for excavation of cable trench. (Note: The work will be executed inside the factory premises, so that special precaution shall be taken by the contractor for safe guard of existing installations. Any damage during excavation of work will be borne and rectified by the contractor.) | 1800 | Per Square Metre |
12 Days Left