Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Uttar Pradesh Power Transmission Corporation Limited
Tender ID4066298
Organisation NameUttar Pradesh Power Transmission Corporation Limited
Tender BriefCorrigendum : Supply Of 33 Kv Ndr Relay And 33kv Overcurrent/earthfault Relay With Reffiting Commissioning And Testing Work At 132 Kv S/s Rasoolabad, Kanpur Dehat Under Etd-1 Govind Nagar Kanpur.
Last Date For Submission21st May, 2026
Opening Date22 May, 2026
Cost
Document Cost590.00
EMD2150.00
Estimated Cost212400.00
Location
CityKanpur
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Providing and Fixing of 33KV New over current/ Earth Fault, high speed numerical (IEC 61850) type relay of UPPTCL approved vendor make like Siemens/ABB/Schneider/ERL/Ashida. with all connection and erection, testing, commissioning and setting for 33 kv capacitor bank ABB make panel & 33KV Kanchausi feeder installed at 132 KV S/S Rasoolabad with Safe removal/dismantling of existing relay after opening of all control cable connection and making appropriate place on the panel by cutting, welding and adding new M/S sheet for placement of housing of new numerical relay and proper connecting on panel & covering with beeding. The work also includes Preparation of interconnection drawing, modifications in internal wiring on existing 33 KV capacitor bank & 33KV Kanchausi feeder panel.2No
2Providing and Fixing of 33 KV New NDR numerical relay of UPPTCL approved vendor make like Siemens/ABB/Schneider/ERL/Ashida with all connection and erection, testing, commissioning and setting for 33 kv capacitor bank ABB make protection panel installed at 132 KV S/S Rasoolabad along with Safe removal/dismantling of existing relay after opening of all control cable connection and making appropriate place on the panel by cutting, welding and adding new M/S sheet for placement of housing of new NDR numerical relay and proper connecting on panel & covering with beeding. The work also includes Preparation of interconnection drawing, modifications in internal wiring on existing 33 KV capacitor bank ABB Make protection panel.1No
3Note:- After completion of above relay replacement work if any problem arising within six month of date of commissioning will be rectified/relay replacement by firm
21st May, 2026

5 Days Left

WhatsApp