Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4032416 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Improvement Of Road From Gurudev Road To Icai Bhawan Road And Awadhpuri Road Under Zone-06. |
| Last Date For Submission | 14th May, 2026 |
| Opening Date | 14 May, 2026 |
| Document Cost | 46689.00 |
|---|---|
| EMD | 7649000.00 |
| Estimated Cost | 359578347.00 |
| City | Kanpur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PART- A (CIVIL) ROAD CONSTRUCTION | ||
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil (SOR No. PWD-2.8.1) | 3731.000000 | Cum |
| 3 | Construction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortar grader on prepared surface, mixing by mix in place method with rotovator at OMC & compacting with vibratory roller to achieve the desired density as per clause 401. Close graded granular sub- base Material as per table 400-1. Grading- I Material.(Approved By Municipal Corporation) | 1430.000000 | Cum |
| 4 | Providing , laying ,spreading and compacting graded stone aggregate to Wet Mix macadom specification including premixing the material by tipper to site,laying in uniform layers with paversin sub-base base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Grade -1 as per Engineer-in-Charge. (SOR NO. PWD-4.1.8) | 1430.000000 | Cum |
| 5 | Providing and applying tack coat with Bitumen (VG-10) using bitumen pressure distributor at the rate of 0.30kg per sqm (VG-10) on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per Technical Specifications MORT&H clause. (Approved By Municipal Corporation) | 31282.000000 | sqm |
26 Days Left