| 1 | Operation of 40 MLD Tertiary Treatment Plant at Bingwan 210 MLD STP Campus based on Biological treatment (MBR) including ultrafiltration and Reverse osmosis system with operating staffs (Plant Manager, Safety officer, supervisors, Operators, Elecrician, Mechanic, Chemist, Lab Assistant, Scada operatos etc) for all works as per necessary requirement at each unit of TTP (TTP feed sump, Fine Screen, Bioreactor, UF membrane scour air, MBR Permate Tank, RO system, Degasser Tower, RO permeate Tank , etc and its associated parts) to meet desired parameters for Thermal Power Plant.Upkeeping of Plant and Campus should be ensured. For first year from date of start of O&M work. | 12 | months |
| 2 | Operation of 40 MLD Tertiary Treatment Plant at Bingwan 210 MLD STP Campus based on Biological treatment (MBR) including ultrafiltration and Reverse osmosis system with operating staffs (Plant Manager, Safety officer, supervisors, Operators, Elecrician, Mechanic, Chemist, Lab Assitant, Scada operatos etc ) for all works as per necessary requirement at each unit of TTP (TTP feed sump, Fine Screen, Bioreactor, UF membrane scour air, MBR Permate Tank, RO system, Degasser Tower, RO permeate Tank , etc and its associated parts) to meet desired parameters for Thermal Power Plant.Upkeeping of Plant and Campus should be ensured. For second year from date of start of O&M work. | 12 | months |
| 3 | Operation and Maintenence of 40 MLD Tertiary Treatment Plant at Bingwan 210 MLD STP Campus based on Biological treatment (MBR) including ultrafiltration and Reverse osmosis system with operating staffs (Plant Manager, Safety officer, supervisors, Operators, Elecrician, Mechanic, Chemist, Lab Assitant, Scada operatos etc ) for all works as per necessary requirement at each unit of TTP (TTP feed sump,Fine Screen,Bioreactor,UF membrane scour air,MBR Permate Tank,RO system,Degasser Tower,RO permeate Tank , etcand its associated parts) to meet desired parameters for Thermal Power Plant.Upkeeping of Plant and Campus should be ensured. For third year (8 months) from date of start of O&M work. | 8 | months |
| 4 | Chemical Consumption required at 40 MLD TTP to meet out the desired outlet parameters as per requirment of Panki Thermal power Plant.
Methanol(Liquid,100%) | 903163.00 | kg |
| 5 | Citric Acid (powder,100%) | 50648.00 | kg |