Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4853960 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Repairing Of Havan Kund, Grill, Floor At Ranighat In Ward-13 Zone-04. |
| Last Date For Submission | 9th Jul, 2026 |
| Opening Date | 09 Jul, 2026 |
| Document Cost | 590.00 |
|---|---|
| EMD | 29472.00 |
| Estimated Cost | 294719.00 |
| City | Kanpur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). | 32.0500 | sqm |
| 2 | Dismentalllng of B.O.E soling/Inter locking tiles Including Stacking of servicable direction of EI/C (Labour only)material and disposal Dismentalllng of B.O.E soling/Inter locking tiles Including Stacking of servicable direction of EI/C (Labour only)material and disposal of unservicable material within a lead of 50m as per | 20.25 | sqm |
| 3 | MIid Steel Iron 'Z' section windows and ventilators excluding cost of glass panes of but Including supply of all materials.its fabrication, nuts and bolts, holdfast, labour and T&P required for proper completion of work as per direction of Engineer-in-charge and also including cost of handles,stays etc,In all resoect at site of work. | 1521.00 | kg |
| 4 | Concrete/R.C.C. Work-Concrete /R.C.C Work Providing and laying cement concrete in kerbs, steps and the like at or near ground level excluding the cost of centering, shuttering and finishing. 1:1 :3 (1 Cement: 1 coarse sand(zone-111) : 3 graded stone aggregate 20 mm nominal size) | 0.972 | cum |
| 5 | Construction of granual sub base (GSB) with well graded materails in uniform layer etc all complete. Construction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory roller to achieve the desired density as per clause 401. | 7.754 | cum |
2 Days Left