Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4856580 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Zone-01 Ward-79 Ke Antargat Thana Feelkhana Se Ganesh Sahankar Vidaythri Park Mod Tak Shobha Yatra Marg Ka Sudhar Ak Karaya |
| Last Date For Submission | 8th Jul, 2026 |
| Opening Date | 08 Jul, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 99799.00 |
| Estimated Cost | 997990.00 |
| City | Kanpur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | 697-FS17005-DIMOLITION & DISMENTLING-Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet).-Rate-67 per 1 Sqm. | 480.00 | sqm |
| 2 | Non SOR-F31028-Non SOR-Cortage of Earth or Malvaup to 3 KM including all completion of work Cortage of Earth or Malvaup to 3 KM including all completion of work-Rate-116.96 per 1 Cum. | 72.00 | cum |
| 3 | NA-S31017-Non SOR-Non SOR Raising manhole by dismantling & refixing of manhole cover & frame including dimantling C.C. and C.C. work in 1:2:4 but excluding brick work which taken separately and all completion of work.-Rate-704 per 1 Each | 5.00 | Each |
| 4 | NA-S31011-Non SOR-Non SOR Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1cement : 3 coarser sand) including making joints with or without grooves (thickness of joints except ar sharp curve shall not to more than 5mm) including making drainage, opening wherever required complete etc. as per direction of Engg-in-charge (Length of finished kerb shall be measured for payment)-Rate-458 per 1 Rmt | 30.00 | rmt |
| 5 | 16.43.2-F32011-DSR-"Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, durability as per direction of the Engineer-in-charge. "Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, durability as per direction of the Engineer-in-charge.Note: 1) Excess/less cement used than specified in this item is payable/ recoverable separately. M-30 grade plain cement concrete (cement content considered @ 340Kg/cum)"-Rate-8538.54 per 1 Cum. 71 | 71.25 | cum |
1 Days Left