Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4794931 |
|---|---|
| Organisation Name | Rail Coach Factory |
| Tender Brief | Supply Of Bogie Bolster With In Built Reservoir For Memu Ob 3ph Memu/dmc & Tc Coaches, As Per Drawing: Icf/sk3-0-4-001 Alt.'dr', Packing Instruction: Packing Instruction Of Memu Bogie Bolster ( Pl No. 33504088, 31047130, 31047129) 1. All Machined Surface Shall Be Protected From Oxidation And Corrosion By Applying Two Coats Of Rust Preventive Oil To Is Spec. No. 493 Pt. I Viscosity Grade 46. 2. The Packing Shall Be Such That All The Machined Surface Shall Be Properly Protected Against Rubbing /impact/scratches With Each Other With Any Mode Of Transportation I.e Wagon/truck/trailers Etc. 3. The Items Should Be Packed In 04 Nos In Iron Box Pallet Prepared By Firm Suitable For Said Items. The Items Should Be Separated To Avoid Rubbing And Tightened With The Help Of Rods/channel Usingnuts And Bolts. The Packing Shall Be Such That Transit Damage If Any Shall Be At The Cost Of Supplier Till Unloading In Shell Depot. 4 Each Packing Should Have An Identification Showing P.o. No., Pl No. Description, Drawing No./spec., Quantity, Firm's Name & Address And Dispatch Detail Etc. Note:- Iron Box Pallet Shall Be Returned To Firm When Empty If Agreed By Respective Depots. , Proction Procedure: As Per Drawing [ Warranty Period: 66 Months After The Date Of Delivery ] |
| Last Date For Submission | 29th Jul, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Kapurthala |
|---|---|
| State | Punjab |
28 Days Left