Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5023608 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Providing Barricading Arrangement And Temporary G.s Sheet Roofing Pandal In The Beach Road Opposite Of Hotel Ashok International For Celebration Of Independence Day 2026. |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 28 Jul, 2026 |
| Document Cost | 525.00 |
|---|---|
| EMD | 11981.00 |
| Estimated Cost | 584073.00 |
| City | Karaikal |
|---|---|
| State | Pondicherry |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade- One or more coats on old work | 460.00 | 1 Sqm (One Square Metre) |
| 2 | Hire charges for fabrication and erection of temporary sloped roof pandal using corrugated G.I sheet. The pandal shall be made out of pipe truss of span upto 12.2m (40 feet) supported with 150mm dia G.I pipe (Vertical support) at regular intervals of 6.10m (20 feet). The G.I sheets shall be fixed over the purlins of 65mm dia G.I pipe at spacing not exceeding 1.50m with necessary hooks bolt, nut and washers. The height of | 990.00 | 1 Sqm (One Square Metre) |
| 3 | roof shall be 6.10m (20 feet) at frontand 4.00m at rear having sufficient length. The bottom of the pandal (ceiling) shall be nealty covered with cada cloth, neatly decorated with colour papers and paper flowers as directed by the Engineer-in-charge. The pandal shall be dismantled and the site shall be cleared after the founction is over, the pipe holes in the ground should be filled with earth / sand as directed. The rate to include the cost of providing temporary pandal with all materials, labour, dismantlement etc., complete as directed by the Engineer in charge. The rate is inclusive of all taxes. | ||
| 4 | Providing and laying prefabricated wooden paltform made up of 19mm thick water proof plywood of size 2.40 x 1.20m edges fastened with MS angels of 20 x 20 x 4mm for platform firmly fixed over the screw jack at distance of 2.40m C/C on longitudinal and 1.20m C/C on lateral directions at an average height of 0.15m above the existing ground level. The rate to include the cost of fabrication the plywood, fixing at site and dismantling the same after the program all as directed by the Engineer in charge. | 90.00 | 1 Sqm (One Square Metre) |
| 5 | Hire charges for MS square tube barricading arrangements made out of 25mm MS square tube around vertical at 0.30m centre to centre and one horizontal to overall size 2.00m x 1.20m and supported with 75sqmm soild rod fixed in ground including bolts and nuts. The pipe holes should be filled up with suitable materials etc., as directed by the Engineer-In charge. The rate is inclusive of all Taxes. | 40.00 | 1 Sqm (One Square Metre) |
6 Days Left