Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5736539 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Annual Rate Contract Of Providing And Erecting Of All Types Of Street Light, Garden Street Lights, Outdoor Street Lights Of Building Compound, Lake Street Lights, High Mast Tower And Mini Mast Tower With Control Switching On And Off Including Operation And Maintenance Within Karamsad Anand Municipal Corporation |
| Last Date For Submission | 13th Oct, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 12000.00 |
|---|---|
| EMD | 700000.00 |
| Estimated Cost | 0.00 |
| City | Karamsad |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supplying and erecting Galvanized M.S pipe post B class 88.9 mm O.D 4 mtr. Long duly painted with two coats of aluminium paint complete with metallic base plate of 300 mm x 300 mm x 4mm thick for using as a compound light pole with approx. weight 32 Kg. | 1.000 | Ea. |
| 2 | Supplying and erecting Galvanized M.S pipe post B class 88.9 mm O.D 6 mtr. Long duly painted with two coats of aluminium paint complete with metallic base plate of 300 mm x 300 mm x 4mm thick for using as a compound light pole with approx. weight 47 Kg. | 1.000 | Ea. |
| 3 | Supplying and erecting Steel tubular pole Swaged confirming to IS 2713 Part II 1980. Manufacturing process of steel tubular pole should be as per IS specification. Basic steel tube should be ISI Marked. Pole should be painted by one coat of Zinc comet Primer and two coat of Aluminium approved paint to be erected on in existing Foundation. The length of poles are as below. A 7.5 mtr. Long Swaged Steel tubular pole i pole as per IS code 410 SP 4 with 300 X 300 X 4 mm base plate with necessary G.I. J Bolts Approximate Pole weight 67 Kg For burial erection | 1.000 | Ea. |
| 4 | ii Add Extra for M.S. Base plate 300 X 300 X 16 mm for pole, Suitable for mounting on surface of foundation with GI foundation bolts, with required stiffeners welded with pole. | 1.000 | Ea. |
| 5 | iii Add Extra for PU base primer and PU Paint on pole. | 1.000 | Ea |
24 Days Left