Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3850863 |
|---|---|
| Organisation Name | Urban Development And Urban Housing Department |
| Tender Brief | Corrigendum : Bid Document For Annual Rate Contract Of Providing Gardening Work, Landscaping Work, Maitenence Work And Other Miscellaneous Works For Karamsad Anand Municipal Corporation |
| Last Date For Submission | 9th Apr, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 2400.00 |
|---|---|
| EMD | 100000.00 |
| Estimated Cost | 0.00 |
| City | Karamsad |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Trenching in ordinary soil up to a depth of 30 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or/and manure before and after flooding trench with water etc. complete as directed by Engineer in charge. (excluding cost of imported earth, sludge or manure). | 1.000 | Cum |
| 2 | Supplying and stacking of good earth including spreading simultaneously as directed. Good earth shall be a friable, typical of cultivated top soil of the locality. It shall be free of sub-soil, stones, earth clad, sticks roots or other objectionable extraneous materials no topsoil shall be delivered in a muddy condition (earth measured in stacks will be reduced by 10perc. for payment) Excavation up to required depth as specified by the landscape architect and distance of 150 mt etc. complete as directed by Engineer in charge. | 1.000 | Cum |
| 3 | Supplying and stacking of dry farm yard manure free from extraneous matter harmful bacteria, insects and chemical on site including royalty etc. complete as directed by Engineer in charge. (manure measured in stacks will be reduced by 8perc. for payment) | 1.000 | Cum |
| 4 | Mixing and filling of mix of manure and good earth in proportion of 1:3 (1 part manure and 3 part sweet earth) in required thickness including proper dressing, levelling, rolling, watering and compacting as per the levels specified etc. complete as directed by Engineer in charge. (cost of manure or / and good earth to be paid separately) | 1.000 | Cum |
| 5 | Supplying and planting carpet lawn as selected including Mixing earth and manure to proportion 80:20perc. and spreading to a thickness of 30 cm or mixing the same, excluding cost of earth and including cost of manure, flooding the ground with water including making of plantation beds and dismantling the same including de-weeding if required. Fine dressing of the ground including watering and maintaining the lawn till the grass forms a thick lawn free from weeds and fit for moving, including composting, chemical treatment etc. complete as directed by Engineer in charge. | 1.000 | Sqm |
12 Days Left