Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4855562 |
|---|---|
| Organisation Name | Directorate Of Municipal Administration |
| Tender Brief | Construction Of Gutter At Gopalnagar And Karjat Road From Parvati Building To Malplaza At Karjat Road In Kbmc Area |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 14 Jul, 2026 |
| Document Cost | 1770.00 |
|---|---|
| EMD | 149997.00 |
| Estimated Cost | 0.00 |
| City | Karjat |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. | 216.84 | CUM |
| 2 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Manual Means | 537.754 | CUM |
| 3 | Transportation of Excavated Material Obtain From Excavation Including Loading, Unloading & stacking upto 5Km etc Complete. 5 Km = 5000m, Lead = 252.22 For Per meter= (252.22/5000)=0.05/meter Total Lead=(5000-50)=4950 meter (4950*0.05)=247.50 | 537.76 | CUM |
| 4 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. | 153.86 | CUM |
| 5 | Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for bed blocks, foundation blocks and such other items including bailing out water, plywood/steel formwork, laying/ pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.), with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With natural sand/V.S.I. quality Artificial Sand | 100.34 | CUM |
6 Days Left