Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Kerala State Electricity Board
Tender ID4321739
Organisation NameKerala State Electricity Board
Tender BriefCorrigendum : Resurfacing Of Road Inside Substation, Extension Of Road To 11kv Yard And Construction Of A New Road From Second Main Gate To Staff Quarters At 110kv Substation, Kubanoor And Resurfacing Of Road At 110kv Substation, Mulleria
Last Date For Submission10th Jun, 2026
Opening Date12 Jun, 2026
Cost
Document Cost5900.00
EMD50000.00
Estimated Cost2378626.00
Location
CityKasaragod
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.140.00m
2Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.260.00m
3Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (i) Using naturally occuring gravel73.00m
4Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead117.00m
5Modified Penetration Macadam 50 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 50630.00m
10th Jun, 2026

8 Days Left

WhatsApp