Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4853022 |
|---|---|
| Organisation Name | Power Development Department |
| Tender Brief | Augmentation Of Gss Kathua From 3x50mva To 4x50mva By Way Of Supply, Installation, Testing and Commissioning Of One 132/66kv ,50mva Power Transformer With Allied Works, Construction Of New 132kv Line Bay ,conversion Of Existing Line Bay To Transformer Bay, Uprating Of Existing Twin Bus Bar Fr |
| Last Date For Submission | 24th Jul, 2026 |
| Opening Date | 25 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 3044000.00 |
| Estimated Cost | 152200000.00 |
| City | Kathua |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Design Engineering, Manufacture, testing at manufacture s work place, packing and forwarding, insurance. Supply of Main Equipments /materials at 3x50MVA 132/66KV Grid Station Kathua | ||
| 2 | Cost of 40/50 MVA, 132/66 KV Three PhasePower Transformers with OLTC, SCADA Compatible RTCC, NIFPS, HV and LV connectors and other required accessories and fittings with online DGA monitoring kit, online dehydration kit and maintenance free automatic Breathers as per detailed technical specs, Mandatory spares as per SBD (current density for HV/LV winding not more than 2.4 A/sq mm. Core flux density not more than 1.5T) | 1.000 | No |
| 3 | Galvanised Structures | 10.000 | MT |
| 4 | Galvanised Nuts and Bolts | 0.700 | MT |
| 5 | 5 Core, 2.5 sq mm, 1100 V, PVC insulated, PVC sheathed, FRLS,alvanized steel wire/ strip armoured stranded copper conductor control cable complete | 300.000 | Mts |
17 Days Left