| Tender ID | 3570978 |
|---|---|
| Organisation Name | Pradhan Mantri Gram Sadak Yojana |
| Tender Brief | Corrigendum : Balance Work For The Construction And Maintenance Of Road From L031 Mahan To Banjal (stage-ii), Package No- Jk07-219, Phase-xii, Block Lohai Malhar, District Kathua (length - 23.817 Kms) |
| Last Date For Submission | 1st Apr, 2026 |
| Opening Date | 04 Apr, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 1531320.00 |
| Estimated Cost | 76566000.00 |
| City | Kathua |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation for structures. Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material up to 3 m depth. All Kind of Soil | 359.15 | CUM |
| 2 | Providing and Laying plain concrete in open foundations complete as per drawings and technical specifications clauses 802,803,1202 and 1203. PCC grade M-10 including all carriages of Materials by MT, leads and lifts etc complete. | 55.95 | CUM |
| 3 | Providing and Laying Plain cement concrete in substructure complete as per drawings and technical specification clauses 802,804,805,806,807,1202 &1204 for height up to 5mtr. PCC grade M-15 including all carriages of Materials by MT, leads and lifts etc complete. | 94.15 | CUM |
| 4 | Providing and Laying Plain cement concrete in substructure complete as per drawings and technical specification clauses 802,804,805,806,807,1202 &1204 for height up to 5mtr. PCC grade M-20 including all carriages of Materials by MT, leads and lifts etc complete. | 10.20 | CUM |
| 5 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specification clauses 800,1205.4,&1205.5 R.C.C. M-25 including all carriages of Materials by MT, leads and lifts etc complete. | 8.95 | CUM |