Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4253900
Organisation NamePublic Works Department
Tender BriefCorrigendum : Permanent Restoration Of Pandrar Link Road To Sidco Industry (under Ut Capex Road Sector Capex Budget 2025-26) ) (2nd Call)
Last Date For Submission22nd May, 2026
Opening Date23 May, 2026
Cost
Document Cost600.00
EMD17960.00
Estimated Cost898000.00
Location
CityKathua
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Providing , laying, spreading and compacting crushed stone aggregate of 63 mm to 45 mm sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming of 13.2 mm nominal size (Type - A) screening/binding material as stone dust to fill up interstices of coarse aggregate, watering and compacting to the required density, finished work to be measured including all leads, lifts and carriage of material by MT/ H.L. (conforming to clause 404 of MORT&H specifications).148.50Cum
2Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to Wet Mix Macadam ( W M M ) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density complete as per specifications and directions of Engineer-in-Charge.74.25Cum
3Providing and laying 25 mm Thick Semi- Dense Bituminous Concrete compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification including tack coat @ 0.75 kg/sqm on WBM surface complete and as per directions of Engineer-in-Charge.990.00Sqm
4Supplying and laying including digging, carrying by lorry, filling River Bed Material including watering & consolidation in layers to specified lines, camber, grades and cross sections. Finished work including material, labour and all leads and lifts, carriage of material by MT/HL. 151.80Cum
5Providing and fixing inauguration stone (granite of size 3/x 2/-0/) including engraving , painting, writing and const. of pedestal of size 4/-5// x 5/-5// height by way of brick work, plastering and painting incl. all leads , lifts and carriage of material by M.T./H.L.1.00No.
22nd May, 2026

1 Days Left

WhatsApp