Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4926361 |
|---|---|
| Organisation Name | Pradhan Mantri Gram Sadak Yojana |
| Tender Brief | Corrigendum : Providing And Laying Of Renewal Coat On Road From L077 Hatli To Badoli Package No. Jk07-248 |
| Last Date For Submission | 21st Jul, 2026 |
| Opening Date | 22 Jul, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 78840.00 |
| Estimated Cost | 3942000.00 |
| City | Kathua |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres( Ordinary Soil 80%, Ordinary Rock 20%) . | 10 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10(1 cement : 5coarse sand : 10graded stone aggregate 40 mm nominal size) | 1.5 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) incl. all leads, lifts & carriage of material by MT/ H.L. | 13.5 | Cum |
| 4 | Centring and shuttering including strutting propping etc and removal of form work Foundations, footings, bases of columns etc. for mass concrete. | 18 | cum |
| 5 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specificationincluding premixing the material with water at OMC in mechanical mixplant, carriage of mixed material by tipper to site, for all leads & lifts,laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | 67.50 | CUM |
Ending Today