Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Forest Department
Tender ID4656081
Organisation NameForest Department
Tender BriefCorrigendum : Up Gradation Of Df Office And Dfo Residence Kathua Forest Division Under Capex For The Year 2026-27.
Last Date For Submission27th Jun, 2026
Opening Date29 Jun, 2026
Cost
Document Cost600.00
EMD20000.00
Estimated Cost1000000.00
Location
CityKathua
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Providing and laying integral cement based water proofing treatment including preparation of surfaces as required for treatment of roofs, balconies, terraces etc consisting of following operations. a) Applying a slurry coat of neat cement using 2.75kg/sqm of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over the RCC Slab including adjoining walls upto 300mm height including cleaning the surface before treatment. b) Laying brick bats with mortar using broken bricks/ Brick Bats 25mm to 115mm size with 50% of Cement mortar 1:5 (1 Cement : 5 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over 20mm thick layer of cement mortar of mix 1:5 (1 Cement : 5 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineerin-charge to required slope and treating similarly the adjoining walls upto 300mm height including rounding of Junctions of walls and slabs) c) After two days of proper curing applying a second coat of cement slurry using 2.75kg/sqm of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge. d) finishing the surface with 20mm thick joint less cement mortar of mix 1:4(1 cement: 4 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300mm/sq 3mm deep. e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test. All above operations to be done in order and as directed and specified by Engineerin-charge. With average thickness of 120mm and minimum thickness at khurra as 65 mm102.984Sqm
2Providing and fixing of water proofing membrain sheet 3mm thick1108.110Sft
3Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement: 3 fine sand) as per standard design. In 75x75 mm deep chase.69.610m
4Brick work with common burnt clay F.P.S.(non-modualar) bricks of class designation 75 in super structure Cement mortar 1:6 ( 1 cement : 6 fine sand)0.425Cum
5Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level Qty vide item no:-50.425Cum