Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4103240 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Removal Of Potholes On Various Roads (2025-26) 1.removal Of Potholes On Airwan To Nagri Road Balance Portion (under Pothole Programme 2025-26) 2. Removal Of Potholes On Changran To Nagri Road Balance Work (under Pothole Programme 2025 26) 3. Removal |
| Last Date For Submission | 5th May, 2026 |
| Opening Date | 06 May, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 68680.00 |
| Estimated Cost | 3434000.00 |
| City | Kathua |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Part 1.Removal of potholes on Airwan to Nagri Road Balance Portion(Under Pothole Programme 2025-26) | ||
| 2 | Supplying and laying including digging, carrying by lorry, filling River Bed Material including watering & consolidation in layers to specified lines, camber, grades and cross sections. Finished work incl. material , labour all leads , lifts and carriage of material by MT/HL. | 62.00 | Cum |
| 3 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to Wet Mix Macadam ( W M M ) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density complete as per specifications and directions of Engineer-in-Charge. | 8.44 | Cum |
| 4 | Providing and laying 25 mm Thick Semi- Dense Bituminous Concrete compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification including tack coat @ 0.50 kg/sqm on bitumen surface and 0.75 kg/sqm on WBM surface complete and as per directions of Engineer-in-Charge. | 1313.00 | Sqm |
| 5 | Part 2. Removal of potholes on Changran to Nagri Road balance work (Under Pothole Programme 2025 26) |
9 Days Left