Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Andaman Lakshadweep Harbour Works
Tender ID3883671
Organisation NameAndaman Lakshadweep Harbour Works
Tender BriefCorrigendum : Renovation Of The Western Side Approach Jetty And Berthing Head At Chetlath Island
Last Date For Submission27th Apr, 2026
Opening Date28 Apr, 2026
Cost
Document Cost0.00
EMD328780.00
Estimated Cost16438960.00
Location
CityKavaratti
StateLakshadweep

Register to see full details

BOQ Items
#ItemQtyUnits
1ABSTRACT - I - Rennovation work of western side Approach jettyat Chetlat (North side) Dismantling of existing damaged concretes of slab, longitudinal beams, cross beams, hand rails, electric posts, low landings, screen walls, midtide beams etc and transporting the materials to the department stack yard as instructed by EIC leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy machineries like concrete cutter, demolition hammer, breaker etc, cost of labours etc complete.101.63Cum
2Providing and laying RCC (M30) with 1:0.9:1.8 mix (1cement,0.9 M sand,1.8 20mm stone chips) for short colums, beams, slabs of old approach/jetty as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), form work, all labour charges, transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete.82.81Cum
3Providing and laying RCC (M25) with 1:11/2:3 mix (1cement 11/2 Msand,3 20mm stone chips) for Hand railposts, handrails and lightpost etc as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Stone Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc. complete6.06Cum
4Centering and shuttering for Hand railposts, handrails and lightpost etc including cost of all materials for the form work, transportation charge of materials to the site, hire charge of woodcutting tools and minor tools as per the direction of EIC etc complete.125.09Sqm
5Fabrication and fixing of reinforcement (Fe 500D make SAIL/TATA/RINL/JINDAL or its equivalant) as per the direction of Nodal Officer, including cost of material, fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to work site, all T&P required for the work etc. complete.150.00Qtls
27th Apr, 2026