| Tender ID | 3979174 |
|---|---|
| Organisation Name | Rural Works Department |
| Tender Brief | Corrigendum : Construction Of Gundilo Adivasi Sahi To Dlamalia Rd Road In The Dist. Of Jajpur For The Year 2025-26. |
| Last Date For Submission | 5th May, 2026 |
| Opening Date | 06 May, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 297211.00 |
| Estimated Cost | 29721052.00 |
| City | Kendrapara |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. as per approved Drawing & Technical Specifications and as per Clause - 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) as per direction of the Engineer in Charge | 12,000.000 | sqm |
| 2 | Construction of embankment with approved materials deposited at site fromBorrow Pit and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site).as per the Direction of Engineer in Charge .----With mechanical lead upto 1000m | 14,062.520 | cum |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site).as per the Direction of Engineer in Charge . | 733.530 | cum |
| 4 | Fine dressing and turfing with one extra lead of 50m and 1.5m one extra lift as per Sepification and direction of Engineer-in-charge. | 8,684.712 | sqm |
| 5 | Construction of granular sub-base by providing Close graded Granular sub base Grading-III material as per table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoSRT&H Specifications for Road & Bridge works (4th Revision) | 1,631.260 | cum |