Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5020905 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Balinabdha To Naradapur Road_road_boxcell Culvert -3x5x3-,stonepitching, Wing Wall_at 11.000 Km |
| Last Date For Submission | 28th Jul, 2026 |
| Opening Date | 29 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 67800.00 |
| Estimated Cost | 6779635.00 |
| City | Keonjhar |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of Cement Concrete Grade M-15 & M20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 66.000 | cum |
| 2 | Earth work in excavation of foundation trench in all kinds of soil with all lead & lift including dressing and levelling the bed and depositing the excavated earth as directed by EIC | 583.660 | cum |
| 3 | Filling foundation and plinth with sand well watered and rammed with cost of sand etc. complete. | 69.840 | cum |
| 4 | Plain Cement Concrete PCC Grade M15 in open foundation complete as per drawing and technical specifications | 85.220 | cum |
| 5 | Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M-30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction, expansion and construction joints, applying sealant, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification as per direction of the Engineer-in-Charge. | 27.000 | cum |
7 Days Left